The MeteringCheck field is an additional field in the Hubject platform that is provided via OICP 2.3 protocol. This field indicates if a charging session complies with the calibration law requirements established by the respective federal entity.
As CPO, what is the process to send this new field to the HBS?
This feature is only available for CPOs who are using OICP 2.3. The CPO can add the field MeteringCheck in the CalibrationLawVerificationInfo part in the CDR with the following properties:
-
This field is an ENUM, with the following predefined values:
-
Passed
-
Failed
-
Not Apply
-
-
The MeteringCheck is an optional field.
Field Name | Values | Description | M/O |
MeteringCheck |
|
This field indicates if the CDR has a charging session that complies with the national calibration law regulation of the country in which the EVSEID is located.
|
O |
Important for the CPO: If the MeteringCheck has the value Passed and the CDR does not contain any value in the field ConsumedEnergy, the CDR will be rejected with the status code 022 - Data Error